Do you meet the following criteria?

  • You are the official owner or occupant (tenant) of the address being applied for.
  • The address that you are applying for is physically separate from adjacent addresses that already have electric service.
  • You have no previous illegal connection cases with Ibaan Electric Corporation.

Requirements

Applying can be easy. Start of submitting the following:

  1. Electrical Plan Layout with Schedule of Loads
  2. Certificate of Final Electrical Inspection (CFEI)
  3. Proof of Residency (Kasunduan sa may ari ng Lupa, Barangay Certificate of Residency)
  4. Photocopy of any Government Valid ID’s
  5. Seminar (Every Friday 1:00PM)

New Service Connection Application Process

Please follow the steps below to apply for a new electric service connection:

Step 1: Complete the Required Documents

Prepare and complete all required documents for a new connection application.

📌 Ensure all documents are complete and accurate before submission.

Step 2: Submit to the Consumer Welfare Desk

Submit your completed requirements to our Consumer Welfare Desk Officers for initial evaluation and processing.

Step 3: Wait for Site Survey

Our authorized surveyor will conduct an on-site inspection to assess:

  • Location of the premises
  • Distance from the nearest distribution line
  • Required materials and facilities
  • Technical feasibility of connection

Step 4: Payment of Required Fees

After the survey, the applicant must proceed to the office to:

  • Confirm the total assessed fees
  • Pay the required charges and other applicable fees

📌 Official Receipt will be issued upon payment.

Step 5: Installation of Service Entrance (Applicant Responsibility)

The applicant must hire a licensed private electrician to install the required service entrance facilities based on the survey recommendations and standard specifications.

This includes:

  • Service entrance wires (Line and Load)
  • Weather cup, Adaptors, RMC, PVC.
  • Meter base
  • Grounding system
  • Other required electrical components

📌 All installations must comply with the DU’s technical standards.

Step 6: Notify for Inspection

Once the service entrance installation is complete, inform our office.

An authorized inspector will conduct an inspection to verify:

  • Proper installation
  • Compliance with technical standards
  • Alignment with DU’s requirements

Step 8: Approval for Connection

If the installation passes inspection and complies with standards, your service connection will be scheduled and energized.

📞 For inquiries and assistance:

Please visit our Consumer Welfare Desk or contact our office during working hours.